Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Disassembly (cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233-14&P-1 5-22.  BLOWER REPAIR - Continued NOTE Use five screws with puller tools on timing gears.  Use 5/16 in.- 24 x 1-1/2 in.  (38 mm) screws and align with tapped holes in gears. (5)   Install puller tool on ieft timing gear (13) with two screws. (6)   Install puller tool on right timing gear (14).  REAR END CAUTION If puller screws are not tightened evenly during removal of timing gears damage may result to gears. (7)   Tighten screws (15) evenly to remove gears (13 and 14). (8)   Remove pullers from gears (13 and 14). (9)   Mark rear end plate to indicate top. (10)    Remove, tag and mark shims (16) and two spacers (17) from each rotor shaft (18). (11)    Remove front end plate cover (19) and gasket (20) by removing nine bolts (21). 5-125

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business