| |
TM 5-4210-233-14&P-1
5-17. AIR COMPRESSOR
This task covers:
a.
Removal
c.
Follow-on Maintenance
b.
Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Coolant Drained (see para 3-6.)
(Appendix B, Section III, Item 1)
Air Tanks Drained (2-17.)
Main Engine Shutdown (2-12.)
MATERIALS/PARTS REQUIRED
Air Cleaner Removed (see para 4-128.)
Pipe Sealant (Item 2, Appendix E)
Exhaust Pipe Removed (see para 5-44.)
a.
Removal.
(1)
Tag and disconnect hoses (1, 2, 3 and 4).
(2)
Remove sending unit (5) from elbow (5A). This will prevent possible damage to sending unit when
removing air compressor.
(3)
Remove four bolts (6) and lockwashers (7) and remove air compressor.
b.
Installation.
(1)
Put compressor in position and install four bolts (6) with lockwashers (7).
(2)
Install sending unit (5) in elbow (5A).
(3)
Connect four hoses (1, 2, 3 and 4) to air compressor.
c.
Follow-on Maintenance.
(1)
Install air cleaner (see para 4-1
(2)
Install exhaust pipe (see para 5-44.).
(3)
Refill coolant (see para 3-6.).
5-96
|