Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: AIR OPERATED AERIAL DISCHARGE VALVE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233-14&P-1 4-199.  AIR OPERATED AERIAL DISCHARGE VALVE This task covers: a. Removal d. Assembly b. Disassembly e. Installation c. Cleaning and Inspection f. Follow-on Maintenance TOOLS REQUIRED PERSONNEL REQUIRED:  2 Tool Kit, General Mechanics, Automotive (Appendix B, Section III, Item 1) EQUIPMENT CONDITION Main Engine Shutdown (see para 2-12 .) MATERIALS/PARTS REQUIRED APU Shutdown (see para 2-16 .) Dry Cleaning Solvent (Item 3, Appendix E) Batteries Disconnected (see para 4-114 .) Gaskets (Figure 23, Appendix F) Drain Aerial Waterway (see para 2-17 .) Gaskets (Figure 25, Appendix F) a. Removal (1) Remove four nuts (1) and washers (2). Remove actuator (3) from valve (4). (2) Remove two nuts (5), two bolts (6) and two clamps (7). Slide seal (8) onto pipe (9). (3) Remove eight nuts (10), lockwashers (10A) and eight bolts (11). Remove elbow (12), gaskets (13) and valve (4).  Discard gaskets. b. Disassembly. (1) Remove four screws (14), four lockwashers (15), cover (16), gasket (17) and thrust washer (18).  Discard gasket. 4-499

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business