| |
TM 5-4210-233-14&P-1
4-185. RUN/LOCK LEVER AND LINKAGE - Continued
f.
Removal - Run/Lock Lever.
(1) Tag and remove wires from switch (6).
(2) Remove lock nut (10) from screw (15). Tag and remove two ground wires.
(3) Tag and remove remaining wire for light bulb socket (9) from panel light switch.
(4) Remove nut (11), lockwasher (12) and washer (13). Remove rod (14) from lever assembly (5).
(5) Remove four screws (15).
(6) Remove lever assembly (5).
g.
Installation - Run/Lock Lever.
(1) Install lever assembly (5) in panel.
(2) Install four screws (15).
(3) Install rod (14) and secure with washer(13), lockwasher(12) and nut (11). See para. g below to
adjust rod (14).
(4) Attach wire from light bulb socket (9) to panel light switch.
(5) Attach two ground wires to screw (15) with locknut (1 0).
(6) Attach wires to switch (6).
g.
Adjustment.
(1) Remove nut (16), lockwasher(17) and washer(18).
(2) Remove rod (14) from linkage (19).
(3) Move runtlock lever (5) to lock position.
(4) Lift up on linkage (19). Adjust length of rod (14) so that stud on rod (14) lines up with hole in linkage
(19).
(5) Install rod (14) in linkage (19) and secure with washer (18), lockwasher (17) and nut (16).
(6) Check motion of run/lock lever (5). Lever should have full movement from one position to the other
without resistance. Readjust length of rod (14) if necessary.
h.
Follow-on Maintenance.
(1) Connect batteries (see para 4-114).
(2) Perform aerial ladder operation procedures (see para 2-14).
(3) Engine must shift into high idle when lever is in RUN position.
4-476
|