| |
TM 5-4210-233-14&P-1
Table 2-1. Operator PMCS Procedures - Continued
Item
Interval
Equipment Is Not
No.
A
D
W
ITEM TO BE INSPECTED/Procedures
Ready/Available If:
4
PUMP, PIPING SYSTEM AND VALVES - Continued
Prlmlng Pump
Examine pump for signs of oil or water leaks. Report
- Priming pump leaks.
any leak to Unit Maintenance.
Water Tank Assembly
With water tank empty, open water tank cover. Look
- Tank leaks.
for any sign of corrosion or leaks.
Start main engine and connect AUX. suction valve to
pressurized water supply.
Open TANK FILL AND RECIRCULATE valve and
check water tank starts to fill. Listen for water
splashing inside of tank. If valve leaks report to Unit
Maintenance. Close TANK FILL AND RECIRCULATE
valve. Close cover and remove hose connection to
AUX. SUCTION valve.
5
HOSE BODY ASSEMBLY
Hose Body
Check hose body ior dents and scratches. Clean
- Equipment securing
paint work as required. Be sure all fasteners are tight.
hardware broken or
Ensure equipment is correctly in the ladder rack.
severely damaged.
Lights
Check that portable worklights (11O VAC) illuminate.
Check that rear strobe light flashes properly.
Check that hosebed floodlights illuminates.
Check for proper operation of Stop, Turn, Tail,
- Any driving lights are
Marker, and Back-Up lights.
inoperable.
Check that compartment lights illuminate.
2-32
|