| |
TM 5-4210-233-14&P-1
4-47. AERIAL DISCHARGE VALVE
This task covers:
a.
Removal
d.
Assembly
b.
Disassembly
e.
Installation
c.
Cleaning and Inspection f.
Follow-on Maintenance
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
MATERIALS/PARTS REQUIRED
Curb Side Operator's Panel Removed
Silicone Grease (Item 11, Appendix E)
(see para 4-26.)
Dry Cleaning Solvent (Item 3, Appendix E)
Gasket (Figure 23, Appendix F)
Repair Kit (Figure 24, Appendix F)
a.
Removal
(1)
Remove hose (1) from elbow (1A).
(2)
Loosen hose clamp (2) and remove drain hose (3)
from fitting (4).
4-242
|