| |
TM 5-4210-233-14&P-1
4-30. PULL-OUT TREAD PLATE
This task covers:
a.
Removal
c.
Follow-on Maintenance
b.
Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para. 2-12.)
(Appendix B. Section III, Item 1)
APU Shutdown (see para. 2-16.)
Batteries Disconnected (see para. 4-114.)
MATERIALS/PARTS REQUIRED
Lubricating Oil (Item 10, Appendix El
a. Removal.
NOTE
Position tread plate so that heads of bolts
are accessible through holes in stationary
slides.
(1) Remove four acorn nuts (1), four bolts (2),
and tread plate (3).
(2) Remove four bolts (4), four acorn nuts (5),
and two slide rails (6).
b.
Installation.
(1) Install two side rails (6), four acorn nuts (5),
and four bolts (4).
(2) Align tread plate (3).
(3) Install four bolts (2) and acorn nuts (1).
(4) Lubricate tread plate parts with lubricating
oil (Item 10, Appendix E).
(5) Be sure tread plate operates without
binding.
c.
Follow-on Maintenance.
(1) Connect Batteries (see para. 4-114).
4-195
|