Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: PUMP PANEL TOGGLE SWITCHES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233-14&P-1 4-22. PUMP PANEL TOGGLE SWITCHES This task covers: a. Inspection c. Follow-on Maintenance b. Replacement TOOLS REQUIRED EQUIPMENT CONDITION Tool Kit, General Mechanics, Automotive Main Engine Shutdown (see para.  2-12.) (Appendix B. Section III, Item 1) APU Shutdown (see para.  2-16.) Gauge Panel Removed (see para.  4-18.) MATERIALS/PARTS REQUIRED Batteries Disconnected (see para.  4-114.) Tags (Item 32, Appendix E) a. Removal. (1 )  Tag wires and remove screws (3). (2)   Remove nut (1) and lock washer (2). (3)   Remove switch (4). b. Installation. (1 )  Connect wires to switch with screws (3). (2)   Secure switch to panel with nut (1) and lock washer (2). c. Follow-on Maintenance. (1)   Install gauge panel (see para.  4-18). (2)   Connect batteries (see para.  4-114). (3)   Test operation of switch. 4-179

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business