| |
TM 5-4210-233-14&P-1
5-76. APU ENGINE OIL PUMP AND OIL BASE - Continued
e.
Installation
(1)
Install new oil pump gasket (11), oil pump (10), two lockwashers (9), and two capscrews (8).
(2)
Torque two capscrews (8) to 15-20 ft Ibs (21-27 N.m).
(3) Install retainer washer (7) and snap ring (6).
(4)
Install oil intake cup (5).
(5)
Install new oil base gasket (4), oil base (3), six lockwashers (2), and six capscrews (1).
(6)
Torque six capscrews (1) alternately to 32 to 38 ft lbs (44 to 51 N.m).
f.
Follow-on Maintenance.
(1)
Install gear cover (see para 5-68).
(2)
Install flywheel (see para 5-67).
(3)
Install APU (see para 4-207).
5-399
|