| |
TM 5-4210-233-14&P-1
5-62. SWING MOTOR
This task covers:
a.
Removal
c.
Follow-on Maintenance
b.
Installation
TOOLS REQUIRED:
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section 111, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
MATERIALS/PARTS REQUIRED
Ladder Bedded (see para 2-14.)
Tags (Item 32, Appendix E)
a.
Removal.
(1)
Tag and remove two hydraulic hoses (1 and 2) from swing motor (3).
(2)
Plug swing motor (3) ports and cap hydraulic hoses (1 and 2).
(3)
Remove two bolts (4) and swing motor (3).
(4) Replace swing motor O-ring seal if damaged.
b.
Installation.
(1)
Secure swing motor (3) to swing brake (5) with two bolts (4). Torque bolts to 71-75 lb it (96-102 Nm).
(2)
Connect two hydraulic hoses (1 and 2).
c.
Follow-on Maintenance.
(1)
Connect batteries (see para 4-114).
5-354
|