Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
5-42. REAR TANDEM AXLE AND DIFFERENTIAL-Continued
(13)
Connect end of torque rod (103 to brackets ontop of axle with two screws (g), washers (8) and
nuts (7). Torque nuts (17) to 300 to 325 lb ft (406 to 440 Nm).
(14)
Connect end of torque rod (10) to bracket on top of axle (5) with two screws (9), washers (8)
and nuts (7). Torque nuts to 300 to 325 lb ft (406 to 440 Nm). Connect center of torque rod (10) to
frame with screws (14), washers (13) and nuts (12). Torque nuts (12) to 300 to 325 lb ft (406 to 440
Nm).
(15)
Fill axle with gear oil (see pare 4-166).
f.
Follow-on Maintenance.
(1) Refer to para 5-7 and connect interaxle drive shaft (1) to rear tandem axle differential.
(2) Install brake chambers (see para 5-34) and slack adjusters (see para 4-143) on axle.
(3) Install brake shoes and drums (see para 5-36 and 5-37).
(4) Refer to para 4-143 and install wheels and tires on axle.
(5) Raise truck and remove blocking from beneath truck.
(6) Remove jack from beneath truck and remove chocks from beneath front wheels.
(7) Connect batteries (see para 4-114).
5-285

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business