|
|
TM 5-4210-233-14&P-1
5-14. STARTER REPAIR AND TESTING
This task covers:
a. Disassembly
d. Assembly
b. Cleaning and Inspection
e. Follow-on
c. Testing
Maintenance
TOOLS REQUIRED
EOUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
MATERIALS/PARTS REQUIRED
Starter Removed (see para 5-12.)
Dry Cleaning Solvent (Item 3, Appendix E)
Engine Oil (OE) (Item 20, Appendix E)
Lint Free Cloth (Item 42, Appendix E)
Epoxy Adhesive (Item 35, Appendix E)
a. Disassembly.
(1)
Matchmark end cap (1), field frame (2), lever housing (3), and drive housing (4).
(2)
Remove inspection plug (5) and gasket (6) from field frame (2).
(3)
Remove inspection plug (5) and gasket (6) from [ever housing (3).
5-68
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |