|
|
TM 5-4210-233-14&P-1
5-13. STARTER SOLENOID
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Engine Shutdown (see para 2-12.)
(Appendix B, Section 1II, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
Starter Removed (see para 45-12.)
a. Removal.
(1)
Remove nut (1) and lockwasher (2).
(2)
Disconnect ground lead (3) from terminal (4).
(3)
Remove nut (5) from motor terminal (6).
(4)
Remove nut (7) from field terminal (8).
(5)
Remove nut (9) and ground lead (3).
5-64
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |