|
|
TM 5-4210-233-14&P-1
5-11. ENGINE ASSEMBLY
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
TOOLS REQUIRED
PERSONNEL REQUIRED - 2
Tool Kit, General Mechanics, Automotive
(Appendix B, Section III, Item 1)
EQUIPMENT CONDITION
Main Engine Shutdown (see para 2-12.)
Shop Equipment, Automotive
APU Shutdown (see para 2-16.)
Maintenance and Repair
Batteries Disconnected (see para 4-114.)
(Appendix B, Section III, Item 4)
Cab Roof Panel Removed (see para 4-76.)
Engine Enclosure Removed (see para 4-127.)
MATERIALSIPARTS REQUIRED
Radiator Removed (see para 5-31.)
Plastic Tie Straps (Item 33, Appendix E)
Curb Side Operator's Panel Removed
Butt Splices (Item 27, Appendix E)
(see para 4-26.)
Tags, Identification (Item 32, Appendix E)
Starter Motor Removed (see para 5-12.)
a. Removal.
(1)
Remove air cleaner indicator hose (1) from air intake tube (2).
(2)
Loosen two hose clamps (3) and remove air intake tube (2) with elbows (4) and clamps (5).
(3)
Cover turbocharger opening securely with duct tape to prevent entry of dirt.
(4)
Loosen two clamps (6) and remove flex hose (7).
(5)
Loosen air intake adapter (8) open two air cleaner clamps (9) and remove air cleaner (10).
(6)
Remove four hex head screws (11), flatwashers (12), lockwashers (13) and uts (13A)
n
(7)
Remove air cleaner clamps (9).
5-41
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |