Click here to make tpub.com your Home Page

Page Title: #2 CROSSLAY VALVE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
4-44. #2 CROSSLAY VALVE
This task covers:
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning and Inspection f. Follow-on Maintenance
MATERIAL/PARTS REQUIRED:
EQUIPMENT CONDITION
Took Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12 .)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16 .)
Batteries Disconnected (see para 4-114 .)
MATERIALS/PARTS REQUIRED
All Piping Drained (see para 2-17 .)
Dry Cleaning Solvent (Item 3, Appendix E)
Curb Side Operators Panel Removed (see para
Grease, Silicone (Item 11, Appendix E)
4-26 .)
Cotter Pin (Figure 11, Appendix F)
Repair Kit (Figure 12, Appendix F)
a. Removal
(1) Remove cotter pin (1) and retaining pin (2).
Discard coffer pin.
(2) Remove control rod (3) and nylon washer (4).
(3) Remove eight bolts (5).
(4) Remove valve (6) from between flanges (7).
(5) Remove and discard two O-rings (8).
4-229

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business