Click here to make tpub.com your Home Page

Page Title: RELIEF VALVE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
4-35. RELIEF VALVE
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Piping Drained (see para 2-17 .)
(Appendix B, Section III, Item 1)
Main Engine Shutdown (see para 2-12 .)
APU Shutdown (see para 2-16 .)
MATERIALS/PARTS REQUIRED
Batteries Disconnected (see para 4-114 .)
O-rings (Fig 36, Appendix F)
Curbside Pump Panel Removed (see para 4-26 .)
a. Removal.
(1) Disconnect wires and remove micro switch
and bracket (1).
(2) Remove four bolts (2) and four washers (3).
(3) Remove two bolts (4).
(4) Remove relief valve (5) and pipe (7).
(5) Remove and discard three O-rings (6).
b. Installation.
(1) Install three new O-rings (6).
(2) Install pipe (7) and relief valve (5); secure
relief valve (5) with two bolts (4), four bolts (2)
and four washers (3).
(3) Install micro switch and bracket (1) and
reconnect wires.
c. Follow-on Maintenance.
(1) Install curbside panel (see para 4-26).
(2) Connect batteries (see para 4-114).
(3) Test relief valve operation (see para 2-13).
4-203

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business