|
|
TM 5-4210-233-14&P-1
4-19. WATER TANK LEVEL GAUGE
This task covers:
a.
Removal
d.
Assembly
b.
Disassembly
e.
Installation
c.
Cleaning and Inspection
f.
Follow-on Maintenance
TOOLS REQUIRED:
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section lll, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
MATERIALS/PARTS REQUIRED
Emery Cloth (Item 25, Appendix E)
Gasket (Figure 4, Appendix F)
a.
Removal.
(1) Remove gauge panel (see para 4-18 .).
(2) Disconnect wiring harness from plug (1) on assembly
gauge.
(3) Remove locknut (2), washer (3) and clamp (4).
(4) Remove gauge assembly.
b.
Disassembly.
(1) Remove screws (5).
(2) Remove lens (6) and gasket (7) from plate (8).
(3) Remove bulbs (9) from circuit board (12).
(4) Remove four screws (1 0) and spacers (11) to
remove circuit board (12) from housing (13).
(5) Remove four screws (14) to remove plug (1) from
housing (13).
4-173
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |