| |
TM5-4210-229-14&P
1-5. LIST OF ABBREVIATIONS.
AAL
Additional Authorization List
min
minimum or minute
AFFF
Aqueous Film Forming Foam
mm
millimeters
AR
As Required
mph
miles per hour
BII
Basic Issue Items
N.m
Newton-meters
C
Celsius
No.
Number(s)
COEIL
Components of End Item List
NSN
National Stock Number
cont
continued
NSS
Not Sold/Serviced Separately
DA
Department of the Army
P/N
Part Number
DS
Direct Support
para.
paragraph(s)
EIRs
Equipment Improvement Recom-
PMCS
Preventive Maintenance Checks
mendations
and Services
ES&ML
Expendable Supplies and Materials
psi
pounds per square inch
List
qty
quantity
F
Fahrenheit
RH
Right Hand
FM
Field Manual
rpm
revolutions per minute
GPM
Gallons Per Minute
TAMMS
The Army Maintenance Manage -
Hz
Hertz
ment System
Km
Kilometers
TB
Technical Bulletin
Km/h
Kilometers/hour
TM
Technical Manual
l
liters
TMDE
Test Measurement and Diagnostic
LH
Left Hand
Equipment
LO
Lubrication Order
U/M
Unit of Measurement
m
meter
VAC
Volts Alternating Current
max
maximum
wt
weight
mfg
manufacturing
1-6. DESTRUCTION OF ARMY MATERIAL TO PREVENT ENEMY USE.
Command decision, in accordance with the tactical situation will determine when destruction of the Twin Agent 4x4
Firefighting Truck will be accomplished. For general destruction procedures for this equipment, refer to TM
750-244-3, "Procedures for Destruction of Equipment to Prevent Enemy Use."
1-7. PREPARATION FOR STORAGE OR SHIPMENT.
Refer to Chapter 4 for preparation of the equipment for storage or shipment.
1-2
|