|
|
TM5-4210-224-14& P
5-11.
ENGINE MOUNTING REPLACEMENT. (Continued)
b. Rear Engine Mounting Assembly.
(4) Lower the engine until the through-bolts
can be inserted.
(1) Support the rear of the engine with a
suitable jack to relieve the weight on the
(5) Install the through-bolts (1) and nuts (2)
rear mountings.
and torque the bolt to 85 ft-lbs (115 N-m)
or nuts to 55 ft-lbs (75 N-m).
(2) Remove the mounting-to-crossmember
nuts (6) and washers (7).
(6) Remove the support and reconnect the
battery cables.
(3) Remove the mounting-to-transmission
bolts (8) and washers (9).
b. Rear Engine Mounting Assembly.
(4) Raise the rear of the engine only enough
(1) Install the mounting (10).
to permit removal of the mounting (10).
(2) Lower the rear of the engine.
(5) Remove the mounting (10).
(3) Install the mounting-to-t nsmission bolts
ra
INSTALLATION
(8) and washers (9).
(4) Torque the bolts to 40 ft-lbs (54 N-m).
a. Front Engine Mounting Assembly.
(5) Install the mounting-to-crossmember nuts
NOTE
(6) and washers (7).
The through-bolt must be inserted from
(6) Torque the nuts to 36 ft-lbs (48 N-m).
the rear of the right side mounting
before the mounting is installed in the
(7) Remove the support and reconnect the
vehicle.
battery cables.
(1) Install the engine mounting assembly (5)
to the vehicle.
(2) Install the mounting assembly bolts (3)
and washers (4).
(3) Torque the bolts 3) to 36 ft-lbs (48 N.m).
(
NOTE
Be sure there is a 1 inch (25 mm)
clearance between the throughbolt
head and mounting assembly.
5-27
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |