Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4210-224-14&P
4-130. CONTROL SWITCHES AND GAUGES REPLACEMENT. (Continued)
i.
Install PTO knob (15) by manually turning
t.
Disconnect PTO cable from transmission.
clockwise.
u.
Pull cable out through bracket inside cab.
j.
Install pump pressure gauge (14) to panel and
secure  with  two  screws  through  pump
v.
Remove brake lock knob (17) by turning
pressure gauge bracket.
counterclockwise by hand.
k.
Connect 1/4 inch plastic pipe to rear of pump
w.
Loosen jam nut at rear of mounting bracket
pressure gauge (14).
(16).
l.
Install oil pressure gauge (13) to instrument
x.
Loosen clamp on frame.
panel cluster (11) and secure with two screws.
y.
Pull cable out through bracket (16) inside cab.
m.
Install water temperature gauge (12) to
instrument panel cluster (11) and secure with
z.
Remove two screws and nuts securing
two screws.
bracket (16) to underside of instrument panel.
n.
Install fuel gauge (10) to instrument panel
aa.
Remove PTO and brake lock cable bracket
cluster (11) and secure with one screw.
(16) from underside of instrument panel.
o.
Install water tank level gauge (9) to water
INSTALLATION
tank level gauge and switch panel (3) and
secure with two screws.
a.
Install PTO and brake lock cable bracket (16)
to underside of instrument panel and secure
p.
Connect water tank level gauge wire plug to
with two screws and nuts.
back of water tank level gauge (9).
b.
Install brake lock cable through bracket inside
q.
Install rocker switches (5, 6, 7, and 8) through
cab.
rear of water tank level gauge and switch
panel (3).
c.
Secure cable by tightening clamp on frame.
r.
Install wire leads to rocker switches (5, 6, 7,
d.
Tighten jam nut at rear of mounting bracket
and 8) and remove tags.
(16).
s.
If indicator light circuit board is replaced,
e.
Install brake lock knob (17) by manually
solder leads to the circuit board.
turning clockwise.
t.
Install indicator light circuit board to water
f.
Install PTO cable through bracket (16) inside
tank level gauge and switch panel (3) with two
cab.
phillips screws.
g.
Connect PTO cable to transmission.
u.
Install water tank level gauge and switch
panel (3) to instrument panel (4) with four
h.
Tighten jam nut at rear of mounting bracket.
screws.
4-179

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business