|
|
TM 5-4210-224-14&P
4-42. FRONT PANEL REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Equipment Condition
Tools
Para. Condition Description
General Mechanics Tool Kit
Materials/Parts
Front Panel (101-90019)
General Safety Instructions
Engine OFF
Transmission in (N) neutral.
Parking brake and micro-brakelock set.
Batteries disconnected.
REMOVAL
g. Install compartment light (paragraph 4-30).
h. Install curb side door (paragraph 4-29).
a. Remove seven hex nuts (1), washers (2), and
screws (3) securing front panel (4) to mounting
i. Install hose bin dividers (paragraph 4-28).
bracket (5).
j. Install hose rollers (paragraph 4-27).
b. Remove front panel (4).
k. Install hose bed floors (paragraph 4-26).
INSTALLATION
a. Position front panel (4) to mounting bracket (5).
b. Secure panel using seven screws (3), washers
(2), and hex nuts (1).
c. Install priming tank and tubing (paragraph 4-41).
d. Install steps (paragraph 4-40).
e. Install street side pump panel (paragraph 4-39).
f. Install roof panel (paragraph 4-31).
4-76
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |