| |
TM 5-4210-220-34
3-7.
TRANSMISSION - Continued
(3)
If replacement of bearing is determined
necessary remove two snap rings securing
bearing with in gear assembly.
(4)
Using suitable fixture to hold assembly
press in new bearing. Apply retaining
compound (item 23, Appendix B) onto
bearing circumference. Allow parts to dry
for 2 hours.
(5)
Assembly is ready for installation into
transmission housing.
(6)
Remove the 1/2 20 X 3 3/4 in. bolt,
lockwasher and plain washer (5) that
retains the side PTO gear spindle (6).
Install a 1/2 20 X 6 in. bolt to replace the 3
3/4 in. bolt, and tighten it fingertight.
(7) Using a hammer, drive the bolt rearward
while supporting the PTO gear (4). When
the spindle is free of the housing, remove
the bolt, spindle and PTO gear.
(8) Remove the seal ring (7) from the PTO
gear spindle (8). If the gear is damaged,
replace the gear assembly (9).
(9) If replacement of bearing is necessary,
remove two snap rings securing bearing
within gear assembly. Using suitable
fixture to hold assembly, press in new
bearing. Apply retaining compound (item
23,
Appendix
B)
onto
bearing
circumference. Allow parts to dry for 2
hours.
(10) Assembly is ready for installation into
transmission housing.
k.
Removal Of Oil Pan And Filter
(1) Position transmission vertically, converter
housing upward.
(2) Remove two oil pan bolts and install two
5/16 - 18 guide bolts J3387-2.
(3) Remove the remaining twenty-one pan bolts
(1). Remove the oil pan (2). Remove
guide bolts, discard gasket (3).
(4) Remove oil filter retaining bolt (4) and plain
washer (5).
(5)
Remove oil filter (6), seal ring (7), and the
retaining bolt spacer (8).
3-21
|