| |
TM 5-4210-220-12
4-26. DRIVE LINES, POWER TRAIN - Continued
b.
Center Bearing Installation
(1)
Raise center bearing end of drive shaft and aline bearing with mounting holes in frame cross member
(2)
Install capscrews (1) and nuts (2). Tighten nuts finger tight. With all four screws and nuts in place,
tighten nuts to 85 ft lb (115 Nm)
4-509
|