Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-220-12 4-15.  AUXILIARY POWER UNIT - Continued 4-15.1  Auxiliary Power Unit Assembly - Continued (4) Insert capscrews (1) through plate, rubber washer (3) and bottom of box.  Place rubber washer on end of each capscrew followed by washer (2) and locknut (4). (5) Torque locknuts to 30 ft lb (41 Nm). (6) Install pulley cover (15) in compartment.  Lower manual start cover (14) over pulley and tighten capscrews (13). (7) Reconnect fuel delivery and return hoses. (8) Reconnect air intake hose (10) between engine and back of box.  Tighten hose clamps (9). (9) Reconnect electrical wires to engine starter and alternator. (10) Push water hoses (5, 7 and 11) over pump barbed nipples and tighten hose clamps (6, 8 and 12). (11) Remove hose crimp retaining pliers from water hoses. (12) Fill engine with oil as detailed in the Lube Order (LO 5-4210-220-12). (13) Start APU and run for 15 minutes checking fuel and water connections.  This also will remove all air out of the Winterization System. (14) Loosen top hose on pump body heater and bleed all air from the heater. (15) Check level of coolant in main engine radiator and top up as required. 4-144/(4-145 Blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business