Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: TEMPERATURE GAUGE REPLACEMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-218-13&P 4-14.  TEMPERATURE GAUGE REPLACEMENT.  (Refer to Figure 4-6) This task covers: a. Removal b. Installation INITIAL SETUP Equipment Condition Tools Reference General Mechanics Tool Box, Item 1, Section Cover removed from Recovery / Recharger III, Appendix B. paragraph 2-6.1 Materials/Parts Air supply disconnected, paragraph 2-7 Temperature gauge Appendix C 4-14.1.  Removal. a. Remove two screws (1) securing temperature gauge to scale column. b. Retain four standoffs (2), plastic cover (3) and two screws (1) for reuse.  Discard temperature gauge  (4). 4-14.   Installation. a. Place plastic cover (3) and two standoffs (2) on one screw (1). b. Hold new temperature gauge (4) in place and install top screw with standoffs and plastic cover but do not tighten. c. Pass remaining screw (1) through plastic cover (3) and two standoffs. d. Holding temperature gauge (4) in place, install screw through temperature gauge mounting hole. 4-16

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business