Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION V. MAINTENANCE PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-218-13&P SECTION V.  MAINTENANCE PROCEDURES 4-7  REMOVAL AND REPLACEMENT OF PRINCIPAL ASSEMBLIES. The  following  procedures  contain  instructions  to  remove  and  replace  principal  assemblies  of  the  Recovery  /  Recharger Unit.  Disassembly, cleaning, inspection, repair, and assembly instructions for direct support maintenance are specified in Chapter 5. 4-8  HOIST WINCH ASSEMBLY INSTALLATION.  (Refer to Figure 4-1) This task covers: a. Installation INITIAL SETUP: Equipment Conditions Tools Reference Tool Kit, General Mechanics Newly received Recovery / Recharger (Item 1, Section III Appendix B) Unit; paragraph 4-4. Materials/Parts None 4-8.1  Preparation a. Remove hoist winch assembly from shipping position. b. Loosen two self-locking nuts (1) on each hoist strap (2) located on scale frame.  Do not remove nuts. 4-8.2  Installation a. Position hoist bearing (4) on floor of base (bearing in tool box). b. Slide hoist pipe (3) under both hoist straps (2) and rest on bearing. c. Tighten two self-locking nuts (1) on each hoist strap (2). d. Check freedom of swing for assembly and proper winch operation (clicking sound when cable being wound). 4-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business