Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION IV. TROUBLESHOOTING
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-218-13&P SECTION IV.  TROUBLESHOOTING 4-6  GENERAL. This   section   provides   information   useful   to   unit   maintenance   personnel   in   diagnosing   and   correcting   unsatisfactory operation  or  failure  of  the  Recovery  /  Recharger  Unit.    Refer  to  table  4-2  for  a  listing  of  possible  malfunctions  that  may occur in the Recovery / Recharger Unit. WARNING Wear safety glasses or goggles while performing the following procedures. NOTE Before you use this table, perform all checks listed in the Unit PMCS (table 4-1). Table 4-2.  Unit Troubleshooting Procedures MALFUNCTION TEST OR INSPECTION CORRECTIVE ACTION 1.  SYSTEM FAILS TO MAINTAIN PRESSURE Step 1.  Inspect for leakage at fittings and hoses. Replace defective hoses. Step 2.  Defective ball valve. Replace ball valve. Step 3.  Defective pressure regulator. Replace pressure regulator. 2.  SLOW HALON CHARGE RATE (Extinguisher fill time exceeds 15 minutes) Step 1.  Inspect for blockage or kinks in hoses. Replace hose remove blockage. Step 2.  Notify supervisor. 4-5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business