Click here to make tpub.com your Home Page

Page Title: Figure 49. Dome light, and electrical control switches, removal and installation.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Figure 49. Dome light, and electrical control switches, removal and installation.
b. Cleaning, Inspection, and Repair.
106. Primer Pump Motor
(1)  Clean all parts with a clean cloth dampened
a. Removal.  Refer to figure 51, and remove the
in  an  approved  cleaning  solvent,  dry
primer pump motor from the primer pump.
thoroughly.
b. Cleaning, Inspection, and Repair.
(2)  Inspect all parts for damaged or defective
(1)  Clean all parts with a clean cloth dampened
condition.
in an approved cleaning solvent, and dry
(3)  Replace or repair damaged or defective
thoroughly.
parts as necessary.
(2)  Inspect all parts for damaged or defective
c.  Installation.  Refer to figure 51, and install the
condition.
microswitch on the primer valve.
(3)  Replace or repair damaged or defective
parts as necessary.
108. Rear Floodlight
c.  Installation.  Refer to figure 51, and install the
a. Removal. Refer to figure 52, and remove the rear
primer pump motor on the primer pump.
floodlight from the fire truck body.
b. Cleaning, Inspection, and Repair.
107. Microswitch
(1)  Clean all parts with a clean cloth dampened
a. Removal.  Refer to figure 51, and remove the
in an approved cleaning solvent, and dry
microswitch from the primer valve.
thoroughly.
TAGO 6839A
72

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business