Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Repair
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4210-235-13 4-24.  AFFF TANK REPLACEMENT AND REPAIR. - continued (11) Disconnect plug (37) and reducer (38) (12) Disconnect plug (39). c. Repair Repair is by replacement of defective or damaged components only. d. Assembly (See figure 4-26 ) (1) Wrap antisieze tape around threaded end of plug (39).  Connect plug. (2)    Wrap antisieze tape around threaded end of plug (37) and male end of reducer (38) Connect Reducer (38) and plug (37) (3) Wrap antisieze tape around threaded end of plug (36) Connect plug (4) Wrap antisieze tape around threaded ends of nipples (35), (33), (31), (28), (26), (24), (22) and male end of reducer  (29)  Connect  nipple  (35),  elbow  (34),  nipple  (33),  ball  valve  (32),  nipple  (31),  tee  fitting  (30), reducer (29), nipple (28), elbow (27), nipple (26), ball valve (25), nipple (24), elbow (23), nipple (22), and union (11) half. (5) Wrap antisieze tape around threaded ends of nipples (21), (18), (16), (14), (12) and male end of pressure relief valve (19).  Connect nipple (21), tee fitting (20), pressure relief valve (19), nipple (18), elbow (17), nipple (16), ball valve (15), nipple (14), tee fitting (13), nipple (12), and union (11) half. (6)    Connection (11) halves. (7) Wrap antisieze tape around threaded ends of nipples (10) and (8).  Connect nipple (10), check valve (9) with flow arrow pointed toward nipple (10), nipple (8), and elbow (7) (8) Push  new  cable  (6)  end  through  a  new  cable  sleeve  (40)  and  then  loop  through  hole  in  valve  mounting bracket (4) Push cable end back into cable sleeve.  Secure by crimping sleeve Repeat for valve mounting bracket (5). (9) Push loose cable (6) end through another new cable sleeve (40) Push cable end back into cable sleeve to form  a  loop  Just  large  enough  to  fit  retaining  clip  (2)  through.    Secure  by  crimping  sleeve  Repeat  for second cable (6) (10) Slip one retaining clip (2) into each cable (6) loop. (11) Install valve mounting bracket (5) onto ball valve (15) with two screws (3). (12) Install valve mounting bracket (4) onto ball valve (25) with two screws (3) (13) Install one retaining clip (2) over charge ball valve (15) handle in open position and one retaining clip over ball  valve  (25)  handle  In  closed  position.    Install  one  strip  tie  (1)  between  each  retaining  clip  and  valve mounting bracket (4) and (5). 4-60

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business