Click here to make tpub.com your Home Page

Page Title: Table C-6. Pressure Reading
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

SB 74-95-700
TRC 5OP
Table C-6. Pressure Reading
Example
No. 1
No. 2
No. 3
Pressure Reading
3.0
3.0
3.0
Actual Pressure Reading
2.9
2.0
0.4
Action
Accept
Minor Defect
Minor Defect
(4) At no time shall an item pressure reading be
tern to its original configuration.  Check for
leakage
zero.  Should such a condition be found, contact the
utilizing a soap solution, no leaks allowed.
Command ATTN: AMSMC-QAW, Rock Island, IL 61299-
6000, for instructions.
C-5. Report and Reporting.  Utilize the report
and
(5) Disconnect pressure gage and reconnect
reporting required by paragraph 2-8.
sys-
C-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business