Quantcast INSTALLATION - TM-55-1925-292-14-P0295

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 1. Diesel Engine-Driven Firefighting Pump Removal
Up
TM-55-1925-292-14-P Firefighting Fire Alarm and Fire Suppression Systems Inland and Coastal Large TUG (LT) Manual
Next
INSTALLATION - continued - TM-55-1925-292-14-P0296
TM 55-1925-292-14&P
0036 00
8. Remove the 12 bolts (figure 1, item 18) that secure the pump drive shaft (figure 1, item 16) to the pump drive
flange (figure 1, item 19). Remove and set aside the pump drive shaft.
9. Remove the four nuts (figure 1, item 20), four lockwashers (figure 1, item 21), and four bolts (figure 1,
item 22) that secure the firefighting pump (figure 1, item 1) to its foundation. Discard the lockwashers.
WARNING
All personnel in the vicinity of the lifting operations should wear appropriate safety
equipment including gloves, hardhat, and safety shoes. Death or serious injury
can result from failure to heed this warning.
10. Remove the firefighting pump (figure 1, item 1) from its foundation with the endless sling and chain hoist.
INSTALLATION
WARNING
All personnel in the vicinity of the lifting operations should wear appropriate safety
equipment including gloves, hardhat, and safety shoes. Death or serious injury
can result from failure to heed this warning.
1. Using the endless sling and chain hoist, lower the firefighting pump (figure 1, item 1) on its foundation and secure
it using the four nuts (figure 1, item 20), four new lockwashers (figure 1, item 21), and four bolts (figure 1, item 22).
2. Perform the Diesel Engine-Driven Firefighting Pump Alignment procedure (WP 0034 00) for installation and
alignment of the pump drive shaft (figure 1, item 16).
3. Fabricate a new gasket (figure 1, item 14) for the discharge flange (figure 1, item 13) using the discharge
flange as a template. Install the new gasket in the discharge flange.
4. Install the eight nuts (figure 1, item 11) and eight bolts (figure 1, item 12) that secure the discharge flange
(figure 1, item 13).
5. Fabricate a new gasket (figure 1, item 1) for the inlet flange (figure 1, item 9) using the inlet flange as a
template. Install the new gasket in the inlet flange.
6. Install the eight nuts (figure 1, item 7) and eight bolts (figure 1, item 8) that secure the inlet flange (figure 1,
item 9).
0036 00-3