Click here to make tpub.com your Home Page

Page Title: EIA Test Theory.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4931-363-14&P
k. Refer to step 10 in figure 2-6 and in the EIA test
14) to the meter and to the A2 card. (Jl-t is not connected
in the EIA from XM128.)
table. Setting S8 to position 8 connects 18 volts from the
EIA through J2-a to the meter in the test set.
u. Refer to step 20 in figure 2-6 and in the EIA test
l. Refer to step 11 in figure 2-6 and in the EIA test
table. Test signal Gi from the EIA (from XMl36) is
table. Setting S8 to position 9 connects 12 volts from the
connected through EIA J1-u, J2-B of the test set, contact 8
EIA through J2-X to the meter in the test set.
and wiper 1 of S3-K, and the contacts described in o (step
14) to the meter and to the A2 card. (J1-u is not connected
m. Refer to step 12 in figure 2-6 and in the EIA test
in the EIA from XM128.)
table. Setting S8 to position 10 connects 5 volts from the
EIA through J2-Y to the meter in the test set.
v. Refer to step 21 in figure 2-6 and in the EIA test
table. The output of T3-1, the pilot ac reticle output, is
n. Refer to step 13 in figure 2-6 and in the EIA test
connected through J1-d, through J1-EE, through contact 9
table. Setting S8 to position 11 connects -6 volts from the
and wiper 1 of S3-K, and through the contacts described in
EIA through J2-Z to the meter in the test set.
o (step 14) to the meter and to the A2 card. R26 in the test
set simulates the parallel load of the three lamps in a typical
o. Refer to step 14 in figure 2-6 and in the EIA test
pilot reticle lamp assembly.
table. The output of T2-1 in the EIA is connected through
J2-A, through J1-i, through contact 2 and wiper 1 of S3-K,
w. Refer to step 22 in figure 2-6 and in the EIA test
through contact 3 and wiper 1 of S4-H, through contacts 1
table. The output of T3-4, the gunner ac reticle output, is
and 3 of S9 set to position R3, and through contact 2 and
connected through J1-e, through J1-HH, through contact
wiper 1 of S5-A to the meter, and through contact 8 and
10 and wiper 1 of S3-K, and through the contacts described
wiper 2 of S5-A to the phase-determining input of card A2
in o (step 14) to the meter and to the A2 card. R25 in the
at XA2-41.
test set simulates the parallel load of the three lamps in a
typical gunner reticle lamp assembly.
p. Refer to step 15 in figure 2-6 and in the EIA test
table. The output of T2-4 in the EIA is connected through
x. Refer to step 23 in figure 2-6 and in the EIA test
J2-B, through J1-j, through contact 3 and wiper 1 of S3-K,
table. Test signal Gj from the EIA (from XM136) is
and through the contacts described above to the meter and
connected through EIA J1-v, J2-b of the test set, contact
to the A2 card.
11 and wiper 1 of S3-K, and the contacts described in o
(step 14) to the meter and to the A2 card. (Jl-v is not
q. Refer to step 16 in figure 2-6 and in the EIA test
connected in the EIA from XM128.)
table. Test signal A (test signal Pj) in the EIA is connected
through J2-C, through J1-k, through contact 4 and wiper 1
of S3-K, and through the contacts described in o (step 14)
y. Refer to step 24 in figure 2-6 and in the EIA test
to the meter and to the A2 card.
table. The 5 volts ac, phase angle 0 degrees, is connected
through wiper 1 and contact 4 of S4-F, through wiper 1
r. Refer to step 17 in figure 2-6 and in the EIA test
and contact 10 of S3-C, through J1-a, and through J1-BB to
table. Test signal B (test signal Pi) in the EIA is connected
the in-phase end of variable resistors R1 through R4 in the
through J2-D, through J1-m, through contact 5 and wiper 1
EIA. The 5 volts ac, phase angle 180 degrees, is connected
of S3-K, and through the contacts described in o (step 14)
through wiper 1 and contact 4 of 84-G, through wiper 1
to the meter and to the A2 card.
and contact 10 of S3-D, through J1-b, and through J1-CC
to the out-of-phase end of variable resistors R1 through R4
s. Refer to step 18 in figure 2-6 and in the EIA test
in the EIA. The gunner azimuth error signal output from
table. Test signal C (test signal TR) in the EIA is connected
the A13 card in the EIA is connected through J1-P, through
through J2-E, through J1-n, through contact 6 and wiper 1
J1-P in the test set, through contacts 5 and 6 of S9 set to
of S3-K, and through the contacts described in o (step 14)
position R2, and through contact 3 and wiper 1 of S5-A
to the meter and to the A2 card.
and TB1-3 to the meter, and through contact 9 and wiper 2
of S5-A to XA2-41. With no input signal to the A13 card
from the linkage, R2 is adjusted for a null. (The inputs to
t. Refer to step 19 in figure 2-6 and in the EIA test
amplifier card Al3 in the EIA are grounded through EIA
table. Test signal Gk from the EIA (from XM136) is
J3-43 and J4-39 to insure that the readout is not affected
connected through EIA J1-t, J2-A of the test set, contact 7
by these inputs during this zeroing.)
and wiper 1 of S3-K, and the contacts described in o (step
2-19

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business