Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1240-375-34&P
0069 00
INSTALLATION
2
1
1 fc 3 4 9
1.
Apply light coat of grease (item 15, WP 0152 00) on plain bearing (1) and install on worm shaft
assembly (2).
3
1
2
1 fc 3 5 0
2.
Apply light coat of grease (item 15, WP 0152 00) on worm shaft assembly (2) and install in optical
instrument rocker assembly (3).
3.
Align slot in plain bearing (1) with guide pin in optical instrument rocker assembly (3).
4
2
1 fc 3 5 1
4.
Install externally threaded ring (4) and tighten until worm shaft assembly (2) rotates with a drag.
0069 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business