Click here to make tpub.com your Home Page

Page Title: TEST AND INSPECTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1240-375-34&P
0057 00
TEST AND INSPECTION - Continued
NOTE
If the M17/M18 or M17A1/M18A1 quadrant being inspected fails to meet the
required standards, ensure all maintenance authorized at the applicable level has
been performed correctly. Then send the M17/M18 or M17A1/M18A1 quadrant to
depot maintenance.
A final inspection will be performed prior to returning a M17/M18 or M17A1/M18A1
quadrant to the using unit or the supply system.
Setting Up and Adjusting the Optical Equipment Test Fixture and Adapter
1
1 fc 2 3 6
1.
Secure optical equipment test fixture (1) on test bench.
2
3
1
1 fc 2 3 7
0057 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business