|
|
TM 9-1240-375-34&P
0007 00
Table 1. Direct Support Troubleshooting Procedures - Continued.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
1. COUNTER WINDOWS (1)
NOTE
ARE FOGGED OR HAVE
Charge nitrogen pressure
to 7 psi (48 kPa). Remove
hose. Put soap suds (item
19, WP 0152 00) on valve
openings to check for
leakage.
1. Check for loose or defective
1. Tighten or replace valves
valves (2).
2. Purge and charge M17/M18
quadrant with dry nitrogen
(TM 750-116).
3. If counter windows (1) are
still fogged, evacuate to next
higher level of maintenance.
END OF WORK PACKAGE
0007 00-3/4 blank
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |