Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Deflector Optical Assembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   750-116 3-19. Trainer, M55 Laser (figs. 3–80 and 3-81). a.  Barrel  Assembly  (fig.  3-80). Figure  3-80  M55  Barrel  Assembly (1) If necessary, remove the barrel extension by turn- ing  it  counterclockwise. (2) Remove the lens guard and loosen the outlet screw. (3) Perform  purging  and  charging  procedure  para 2-5.b. (4) Purge  instrument  at  5  psig  for  2  minutes. (5) Charge instrument at 1 psig for 1 minute. (6) Leak test for minimum of 5 minutes. (7) Tighten outlet screw and install lens guard. b.  Deflector  Optical  Assembly  (fig.  3-81). (1) Perform  purging  procedure  para  2-5.d. (2) Purge instrument at 5  psig for 2 minutes. 3–20.   Unit,   Reticle   Projector   (fig.   3-82). Figure  3-82  Reticle  Projector  Unit a. Perform purging procedure para 2-5.c. b. Purge  instrument  at  8  psig  for  5  minutes. Figure  3-81  M55  Deflector  Optical  Assembly 3-34

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business