Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Periscope, M32E1 Tank
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 750-116 (1) Perform purging and charging procedure para 2-5.b. (2) Purge instrument at 5 psig for 10 minutes. (3) Charge instrument at 1 psig maintaining pressure for 20 seconds. (4) Leak test for minimum of 5 minutes. c.  Periscope,  M32E1  Tank  (figs.  3-20  through 3-22). ENSURE  THAT  1.5V-OFF-24V  SWITCH ON BOTTOM OF THE INFRARED BODY ASSEMBLY IS SET TO OFF; THIS UNIT CARRIES 16,000 VDC. Do not purge and charge the infrared body assembly in bright light; prolonged exposure can cause damage to the image conversion tube. NOTE Periscope must be removed from installed posi- tion for purging and charging operations. Refer to appendix A for listing of applicable public a- (1)  Head  Assembly  (fig.  3-20). Figure  3-20  M32E1  Head  Assembly (a) Perform purging and charging procedure para 2-5.b. (b) Purge instrument at 8 psig for 5 minutes. (c) Charge instrument at 1 psig maintaining pressure for 10 seconds. (d) Leak test for minimum of 5 minutes. 3-9

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business