TM 55-1925-292-14&P
0026 00
INSTALLATION
1. Align the actuator assembly to the mounting bracket, and secure it in place with the four bolts (figure 10, item 8)
and four new lockwashers (figure 10, item 9).
2. Connect the wiring to the terminals (figure 10, item 7) using the labels from step 6 of Removal as a guide.
Remove the labels.
3. Install the bell actuator assembly cover (figure 10, item 4) and secure it in place with the six screws (figure 10,
item 5).
5. Install the gong (figure 10, item 3) on the bell actuator assembly cover (figure 10, item 4), and secure it with
the bolt (figure 10, item 1) and washer (figure 10, item 2).
6. Perform the Follow-On Service procedure at the end of this work package.
FOLLOW-ON SERVICE
1. If removed, install the fuse cover (figure 1, item 1) over the plastic retaining pins (figure 1, item 2).
2. Remove the lockouts and tagouts (FM 55-502).
3. Set to ON the FIRE DETECTION SYSTEM. circuit breaker in 120V emergency distribution panel No. 1.
4. Test the fire detection system (WP 0017 00 and WP 0025 00) to verify that the system operates properly.
5. Using the proper key, CLOSE and lock the door to the fire and smoke detection panel.
6. After successful testing, notify the maintenance supervisor. General support maintenance assistance is
required for system certification (WP 0039 00).
7. Return the equipment to the desired readiness condition.
END OF WORK PACKAGE