Figure 1. Fire Flap Pull Cable Replacement
INSTALLATION
1. Fasten the fire flap pull cable (figure 1, item 2) in its cable hangers along its entire length.
2. Slide the DC kit (figure 1, item 5) onto the fire flap pull cable (figure 1, item 2) and secure it with the nut
(figure 1, item 14) and bolt (figure 1, item 15).
3. Position the DC kit (figure 1, item 5) in the bulkhead and secure it with the nut (figure 1, item 5) and a new star
washer (figure 1, item 6).
4. Thread the jam nut (figure 1, item 1) completely onto the end of the fire flap pull cable (figure 1, item 2).
5. Thread the T handle (figure 1, item 3) onto the end of the fire flap pull cable (figure 1, item 2) and secure it with
the jam nut (figure 1, item 1).
6. Position the cable clamp (figure 1, item 12) in its attachment point (figure 1, item 13) and loosely tighten the
nut (figure 1, item 11).
7. Push the T handle (figure 1, item 3) all the way IN.
8. Slide the fire flap pull cable (figure 1, item 2) through the cable clamp (figure 1, item 12) until the hole in the
clevis (figure 1, item 9) aligns with the hole in the actuator arm (figure 1, item 10).
9. Tighten the nut (figure 1, item 11).
10. Install the clevis pin (figure 1, item 8) in the clevis (figure 1, item 9) and secure it with a new cotter pin
(figure 1, item 7).
11. Remove the lockouts and tagouts and return the equipment to the desired readiness condition.
END OF WORK PACKAGE