Click here to make tpub.com your Home Page

Page Title: Figure 3. Main Deck General Arrangement
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1925-292-14&P
0004 00
MAIN DECK GENERAL ARRANGEMENT
5
3
4
2
6
2
2
1
7
T
D.C.
UP
LOCKER
CREW'S MESS/
BOATSWAIN'S
DN
RECREATION AREA
STORES
I
15
I
T
8
GALLEY
A
9
8
10
12
11
14
13
5
6
MAIN DECK
Figure 3. Main Deck General Arrangement
Table 3. Main Deck General Arrangement (refer to figure 3)
Key
Control/Indicator
Function
1
Fire Station 4 Cutoff Valve
This valve controls the raw water supply to fire station 4.
2
Fire Alarm Pull Station
This provides the crew with the means to manually activate the
(refer to table 5)
fire alarm system.
3
Engine Room Water
This station contains the valves necessary to actuate the Engine
Washdown System
Room Water Washdown System (ERWWS).
(refer to table 7)
4
Fire Station 5 Cutoff Valve
This valve controls the raw water supply to fire station 5.
5
Thermal Heat Detectors
These detectors sense temperature in excess of 135 F (55.2 C).
6
HF Gas Sounding Tube
This tube allows for the testing of Hydrogen Fluoride (HF) gas.
7
Arms Locker Drenching
This system is designed to provide raw water to the arms locker
System (refer to table 11)
in the event of fire or excessive high temperature.
0004 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business