|
|
TM 55-1925-292-14&P
0002 00
LOCATION AND DESCRIPTION OF MAJOR COMPONENTS
1. Control Station (figure 7, item 1). This control station houses the main cutoff valve for the raw water supplied
to the engine room sprinkler heads and allows for Hydrogen Fluoride (HF) testing.
2. Forward HF Gas Sampling Tube (figure 7, item 2). Located in the damage control locker, this station allows
for HF gas sampling.
3. Sprinkler Heads (figure 7, item 3). These sprinkler heads are located throughout the engine room and AMS
1 and provide raw water to cool the spaces after the FM-200 fire suppression system has been activated.
0002 00-18
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |