DRAFT
TM 5-4210-249-13&P-4
0622
Table 1.
Two-Level Maintenance Allocation Chart for TFFT. (Continued)
(1)
(2)
(3)
(4)
(5)
(6)
Group
Component/
Maintenance
Maintenance Level
Tools
Remarks
Number
Assembly
Function
and Test
Code
Field
Sustainment Equipment
Unit
DS
GS
Depot
C
O
F
H
D
Piping Assembly (Pipe
Replace
0.2
27
Thread Sealing
Compound)
Plumbing, Hoses, and
Replace
1.5
27
Piping
Pressure Reducing Valve,
Replace
0.7
27
Driver's Pre-Connect "A"
Replace
0.7
27
Pressure Reducing Valve,
Driver's Pre-Connect "B"
Tank-To-Pump Intake
Replace
1.0
27
Valve (Driver Side)
Tank-To-Pump Intake
Replace
1.0
27
Valve (Passenger Side)
Valve Driver Pre-Connect
Replace
1.5
27
"A"
Valve Driver Pre-Connect
Replace
1.0
27
"B"
7635
SPECIAL PURPOSE
BODY
Air Lift Bag Storage Box
Replace
0.5
27
Air Vent Guard
Replace
0.5
27
Crew Cab Access Panels
Replace
0.6
27
Crew Cab Assembly
Replace
4.5
8, 27, 25
Crew Cab Bench Seat and Replace
1.0
27
Access Panel
Crew Cab Door/Door
Replace
1.2
27
Hinge
Adjust
27
Crew Cab Door Handle
Replace
0.6
27
Crew Cab Door Latch/
Replace
0.8
27
Linkage
Crew Cab Door Seal
Replace
0.5
27
Crew Cab Door Window/
Replace
2.0
27
Regulator
Crew Cab Inner Door
Replace
0.6
27
Panel
Crew Cab Peep Window
Replace
0.5
27
Crew Cab Rifle Mount
Replace
0.3
27
Crew Cab Roof Hatch
Replace
0.6
27
0622-16