DRAFT
TM 5-4210-249-13&P-4
0573
9.
Remove nut (21) and air regulator (22) from regulator bracket (20).
10. Remove seven elbows (3) and two fittings (4) from four solenoid valves (18) and air regulator (22).
11. Remove two tees (5), control valve (23), elbow (24), and tee (25) from air regulator (22).
TFFT01535
12. Remove two screws (26) and terminal block (13) from junction box (8).
13. Remove four jumpers (27) from terminal block (13).
NOTE
Tag and mark wires prior to removal to ensure proper installation.
14. Loosen nine screws (28) and remove nine wires (29) from terminal block (16).
15. Remove two screws (30) and terminal block (16) from junction box (8).
16. Remove four screws (31) and bulkhead connector (32) from junction box (8).
17. Remove nut (33) and fitting (6) from junction box (8).
END OF TASK
ASSEMBLY
1.
Install fitting (6) on junction box (8) with nut (33).
2.
Install bulkhead connector (32) on junction box (8) with four screws (31).
3.
Install terminal block (16) on junction box (8) with two screws (30).
4.
Install nine wires (29) on terminal block (16) with nine screws (28).
5.
Install four jumpers (27) on terminal block (13).
6.
Install terminal block (13) on junction box (8) with two screws (26).
0573-3