DRAFT
TM 5-4210-249-13&P-3
0459
INSTALLATION
NOTE
Route pump operator's panel wire harness as noted prior to removal.
Install cable ties, split looms, and cushion clips as noted.
1.
Install pump operator's panel wire harness (205) into vehicle.
2.
Connect pump operator's panel wire harness connector DO 2 (203) to main wire harness DO 2
connector (204).
3.
Connect pump operator's panel wire harness connector DO 1 (201) to main wire harness DO 1
connector (202).
4.
Connect pump power distribution connector DP 2 (199) to pump house distribution box DP 2 connector (200).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT03314
5.
Install wire 3895 (197) to pump house ground bolt (198) with lockwasher (196) and nut (195).
0459-21