DRAFT
TM 5-4210-249-13&P-2
0254
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT01241
4.
Install fitting (2) on bracket (6) with lockwasher (5) and nut (4).
5.
Install hose (1) on elbow (3) and fitting (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install pump house panel S (WP 0540)
2.
Close pump house panel A (WP 0539)
END OF TASK
END OF WORK PACKAGE
0254-3/(4 blank)