Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233-14&P-1 5-40.  FRONT STEERING AXLE-Continued (25) Install lock nuts (29) on draw pins (30 and 31) and torque nuts to 30 to 45 lb ft (41 to 61 N•m). (26) Install new gaskets (28) and end caps (27) on steering knuckle. Secure end caps with washers (26) and screws (25). Tighten screws to a torque of 20 to 30 lb ft (28 to 40 N•m). Install four lubrication fittings (24) in end caps. (27) Install steering arm (6) through top of knuckle. Install nut (3B) on steering arm and torque to 390 to 725 lb ft (529 to 982 N•m). Install cotter pin (3A). (28) Install key (40) in slot in arm (2). Install arm in knuckle. Install nut (5) on tube arm. Torque nut to torque of 390 to 725 lb ft (529 to 982 N•m). Align holes in nut and arm and install cotter pin (4). (29) Install tie rods (1) in cross tube (3). Thread tie rod ends into cross tube to position marked on removal. NOTE •   If replacing tie rod or cross tube, toe -in must be reset. •   The cross tube has right hand thread on one end and left hand thread   on   the   other   end.   Make   sure   ends   are   installed correctIy. (30) Torque nuts on clamps to 155 to175 lb fl (210 to 237 N•m). Install cross tube on axle with tie rods (1) through steering arms. Secure tie rod end with nut. Torque nut to 250 to 450 lb ft (339 to 610 N•m). (31) Place cups (20 and 21) in hub (16). Install bearings (18 and 19) and install new oil seal (17). (32) Install hub (16) on knuckle (8). Secure with washer (15), nut (14) and cotter pin (13). (33) Install new gasket (12) and hub cap (11) using washers (10) and bolts (9). (34) Fill hub (16) with oil (item 45, Appendix E). d. Follow-on Maintenance. (1)   Install leaf springs (see para 5-41). (2)   Install brakes and drums (see para 5-36 and 5-37). (3)   Install wheels and tires (see para 4-143). (4)   Connect batteries (see para 4-114). 5-246

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business