Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Assembly (cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233-14&P-1 5-22. BLOWER REPAIR - Continued NOTE To change gap between rotor lobes by 0.001-in. (0.025 mm), add or remove a 0.003-in. (0.076 mm) shim. (45) Add or remove shims (21) to left rotor shaft (4) as necessary. (46) Install blower timing gears according to steps (31) through (35). (47) Check rotor lobe clearance according to steps (38) through (41). NOTE Correct rotor operating is 0.009 to 0.011 in. (0.23 to 0.28 mm).  If rotors do not meet this specifica- tion, do steps (52) through (57). (48) Place 0.010-in. (0.254 mm) feeler gage between rotor lobes (29 and 30).  Rotate rotors while gage is installed. (49) Remove feeler gage. 5-138

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business