| |
TM 5-4210-233-14&P-1
5-19. TACHOMETER DRIVE
This task covers:
a.
Removal
c.
Follow-on Maintenance
b.
Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
Engine cover open
a.
Removal
(1) Loosen jamnut (1).
(2) Loosen screw (2) and remove clamp (3).
(3) Remove tachometer drive housing (4) and gasket (5).
(4) Remove tachometer drive (6).
5-109
|