Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: APU Test
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233-14&P-1 Table 2-1.  Operator PMCS Procedures - Continued Item Interval Equipment Is Not No. A D W ITEM TO BE INSPECTED/Procedures Ready/Available If: 19 AUXILIARY POWER UNIT (APU) - Continued APU Inspect - Continued Check for tightness of electrical connections.  Check cables for damaged insulation. Report any oil or fuel leak, loose electrical connection or damaged cable to Unit Maintenance for repair. Visually inspect exhaust pipe and muffler for leaks. Check muffler is secure and intact.  Report any deficiencies to Unit Maintenance. APU Test Start APU as detailed in para 2-16.  Let engine run for 15 minutes.  Check ammeter and voltmeter indicate smooth 110 VAC output.  Report fluctuating output to Unit Maintenance. 2-45

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business