| |
TM 5-4210-233-14&P-1
4-165.REAR AXLE ASSEMBLIES
THIS TASK COVERS:
a. Service
b. Follow-on Maintenance
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
MATERIALS/PARTS REQUIRED
Hypoid Gear Oil GL-5 SAE 75 W/140,
Item 30, Appendix E
Breather (Figure 164, Appendix F)
a.
Service.
(1) Remove carrier fill plug (1).
NOTE
Rear axle has a capacity of 29 pints (13.7 1).
(2) Remove drain plug (2) and drain gear oil into
suitable container.
(3) Remove and discard breather (3).
(4) Install drain plug (2).
(5) Fill axle with hypoid gear oil GL-5 S.A.E.
75W/140 (Item 30, Appendix E) until it flows
from fill hole.
(6) Install carrier fill plug (1).
(7) Install new breather (3).
b.
Follow-on Maintenance.
(1) Connect batteries (see para 4-114).
4-444
|